Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Oct 23, 2022     45-17 Cabin doors and transparencies step 4A - (4 hours)       Category: Fuselage
Need to have consistent gap around the door. after sanding i got about 2,5mm using a small permagrit flat file. On the door side i have a square edge, while on the canopy side there is still a bevel. I decided to use a 10mmX3mm adhesive rubber seal attached to the right door in order to have a straight and sufficiently rigid edge to contain the epoxy and cab-o-sil i spreaded on the canopy junction. this should preserve the gap and allow for a square edge on the canopy. Sanding will be required probably. Similar process for the left door if result on the right door will be satisfactory


 